Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Place 004 :
Merritt Island or
West Palm Beach
& Channel 061:
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Banana River ' (1) ·
'Cabana Colony Circle ' (1) ·
'E-2 Canal ' (1) ·
'EPB - 10 Canal ' (1) ·
'Indian River ' (1) ·
'Loxahatchee River ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'SWA Retention Canal ' (1) ·
'Sykes Creek ' (1) ·
'Turnpike (SR-91) ' (1) ·
'WPB CANAL C-51 ' (1)
700193 (1) ·
700208 (1) ·
700221 (1) ·
930235 (1) ·
930461 (1) ·
930479 (1) ·
930480 (1) ·
934158 (1) ·
934166 (1) ·
934171 (1) ·
934176 (1) ·
934178 (1) ·
934721 (1) ·
934751 (1)
'0.3 Mi N of 45th St ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-520 - Banana River ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-528 EB - Indian River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)