Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Traffic Year 030: 2014 & Kind 043a: Other & Channel 061: Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.

Use the filters below to narrow your results.

Status:
Date:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
2 (1) · 3 (1) · 4 (1)
Traffic Year 030: (Click arrow to add another value)
Service Under 042b:
Kind 043a: (Click arrow to add another value)
Length 049:
Width 052:
Deck 058:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Future Year 115:
Clearance 116:

Showing below up to 19 results in range #1 to #19.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)