Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Channel 061: Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. & Future Year 115: 2039

Use the filters below to narrow your results.

ObjectID:
Status:
Direction 005e:
Features 006a:
Critical 006b:
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Built 027:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1) · 9 (1)
Traffic 029:
Traffic Year 030:
Length 049:
Width 052:
0 (1) · 10 (1) · 11 (1) · 12 (1) · 13 (1) · 15 (1) · 16 (1) · 17 (1) · 18 (1) · 19 (1) · 20 (1) · 21 (1) · 22 (1) · 24 (1) · 25 (1) · 28 (1) · 31 (1) · 33 (1) · 34 (1) · 35 (1) · 38 (1) · 40 (1) · 41 (1) · 42 (1) · 43 (1) · 45 (1) · 6 (1) · 8 (1) · 9 (1)
Substructure 060:
Future 114:
Future Year 115: (Click arrow to add another value)
Clearance 116:

Showing below up to 79 results in range #1 to #79.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)