Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Deck 058:
Satisfactory
& Channel 061:
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.
Use the filters below to narrow your results.
'Banana River Relief East' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'Halifax River ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'L-5 Canal ' (1) ·
'Lake Worth Tide Relief' (1) ·
'Lake Ashby Canal ' (1) ·
'Middle Haw Creek ' (1) ·
'Padgett Creek ' (1) ·
'St. Lucie River ' (1) ·
'Tide Relief Canal ' (1)
700007 (1) ·
700008 (1) ·
700082 (1) ·
790035 (1) ·
790099 (1) ·
790147 (1) ·
790148 (1) ·
790152 (1) ·
790920 (1) ·
790941 (1) ·
890003 (1) ·
930098 (1) ·
930353 (1) ·
930361 (1)
'0.25mi W of S.R.-A1A ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'Palm Beach - Broward Line' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-404 WB-Banana River ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-A1A over Halifax River' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)