Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Substructure 060: Fair & Channel 061: Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.

Use the filters below to narrow your results.

Status:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
Traffic Year 030:
Length 049:
Width 052:
10 (1) · 11 (1) · 13 (1) · 16 (1) · 5 (1) · 8 (1) · 9 (1)
Superstructure 059:
Substructure 060: (Click arrow to add another value)
Culvert 062:
Rebuilt 106:
Future Year 115:
Clearance 116:

Showing below up to 19 results in range #1 to #19.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)