Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Status:
MM
& Width 052:
17
& Channel 061:
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.
Use the filters below to narrow your results.
884062 (1) ·
934907 (1) ·
934909 (1) ·
934915 (1) ·
934918 (1) ·
934930 (1) ·
934933 (1) ·
934935 (1) ·
934937 (1) ·
935308 (1) ·
940094 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'South Causeway over ICWW ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)