Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Channel 061: Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. & Rebuilt 106 : 1997 or 2009

Use the filters below to narrow your results.

Status:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
2 (1) · 3 (1) · 4 (1) · 6 (1) · 8 (1) · 9 (1)
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 11 results in range #1 to #11.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)