Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Channel 061: Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. & Rebuilt 106 : 1969 or 2004

Use the filters below to narrow your results.

Status:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
11 (1) · 2 (1) · 3 (1) · 5 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 7 results in range #1 to #7.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)