Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Length 049:
21
& Channel 061:
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.
Use the filters below to narrow your results.
'BEL LIDO DRIVE ' (1) ·
'BOBWHITE ROAD ' (1) ·
'BROWNS FARM/CR-827' (1) ·
'Gateway Blvd. ' (1) ·
'GOLDFINCH LANE ' (1) ·
'LA MANCHA AVE. ' (1) ·
'LINTON BLVD ' (1) ·
'PALMWOOD ROAD ' (1) ·
'PONCE DE LEON ST ' (1) ·
'RAVEN COURT ' (1) ·
'ROYAL PALM BCH BLV' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'US-192 EB ' (1)
700018 (1) ·
934136 (1) ·
934363 (1) ·
934485 (1) ·
934518 (1) ·
935900 (1) ·
937350 (1) ·
937351 (1) ·
937352 (1) ·
937353 (1) ·
937354 (1) ·
937355 (1) ·
937356 (1) ·
937357 (1) ·
937362 (1)
'0.03MI W OF DOVE CIRCLE ' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.1MI N OF OKEECHOBEE BLV' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'0.8MI N OF SR 80 ' (1) ·
'1.3MI N OF SR-80 ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'200ft. W of A1A ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'US-192EB - Sawgrass Creek' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)