Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Kind 043a: Steel & Substructure 060: Other & Channel 061: Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.

Use the filters below to narrow your results.

ObjectID:
Status:
Direction 005e:
Critical 006b:
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 5 (1)
Traffic Year 030:
Kind 043a: (Click arrow to add another value)
Width 052:
0 (1) · 10 (1) · 11 (1) · 12 (1) · 14 (1) · 15 (1) · 16 (1) · 17 (1) · 18 (1) · 19 (1) · 22 (1) · 25 (1) · 27 (1) · 28 (1) · 31 (1) · 5 (1) · 7 (1)
Superstructure 059:
Substructure 060: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 44 results in range #1 to #44.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)