Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Length 049:
32
& Channel 061:
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.
& Future Year 115:
Other
Use the filters below to narrow your results.
880042 (1) ·
884082 (1) ·
885601 (1) ·
885602 (1) ·
885605 (1) ·
930073 (1) ·
934100 (1) ·
934318 (1) ·
934344 (1) ·
944008 (1) ·
945260 (1)
'.4mi. East of Congress ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.5MI Nof PT ST LUCIE BLD' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'3.7 MILES NORTH OF SR-60 ' (1) ·
'56th Place North ' (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)