Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Substructure 060 : N/A or Poor & Channel 061: Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel.

Use the filters below to narrow your results.

Status:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
2 (1) · 3 (1) · 4 (1) · 6 (1)
Traffic Year 030:
Service Under 042b:
Kind 043a:
Length 049:
14 (1) · 17 (1) · 23 (1) · 7 (1) · 8 (1) · 9 (1)
Width 052:
Deck 058:
Superstructure 059:
Substructure 060: (Click arrow to add another value)
Direction 102:
Rebuilt 106:
Deck Type 107:
Future Year 115:
Clearance 116:

Showing below up to 10 results in range #1 to #10.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)