Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Channel 061: Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. & Inspect Date 090: 07-17

Use the filters below to narrow your results.

Status:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
2 (1) · 4 (1) · 6 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
53 (1) · 55 (1) · 7 (1) · 8 (1) · 9 (1)
Width 052:
Deck 058:
Superstructure 059:
Substructure 060:
Inspect Date 090: (Click arrow to add another value)
Direction 102:
Rebuilt 106:
Future Year 115:
Clearance 116:

Showing below up to 6 results in range #1 to #6.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)