Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Channel 061:
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel.
& Future Year 115:
2039
Use the filters below to narrow your results.
'BRANT DR/CARL BOTT' (1) ·
'CARLTON RD (CR613)' (1) ·
'CR-708 ' (1) ·
'CR-722 (COVE RD) ' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'CR712A (MCCARTY RD' (1) ·
'DIXIE HIGHWAY ' (1) ·
'EB Forest Hill Bld' (1) ·
'KEEN RD (CR-611) ' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'WB Forest Hill Bld' (1) ·
'WB Lake Worth Rd. ' (1)
890011 (1) ·
890079 (1) ·
890113 (1) ·
894064 (1) ·
930328 (1) ·
930514 (1) ·
934349 (1) ·
935501 (1) ·
940019 (1) ·
940029 (1) ·
940030 (1) ·
940037 (1) ·
940043 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.1 Mile East of A1A ' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.3MI N OF CR-712 ' (1) ·
'0.5MI S of CR-608 ' (1) ·
'0.6MI N OF ANGLE ROAD ' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2.1MI S of SR-70 ' (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)