Drilldown: bridge data

From Indian River Lagoon Project
bridge data > County 003: Saint Lucie & Channel 061: Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel.

Use the filters below to narrow your results.

Status:
County 003: (Click arrow to add another value)
Place 004:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service On 042a:
Service Under 042b:
Type 043b:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 7 results in range #1 to #7.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)