Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Superstructure 059:
Fair
& Channel 061:
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly.
Use the filters below to narrow your results.
'97 TH STREET ' (1) ·
'A1A ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'Entrnce Rd to FDOT' (1) ·
'Highbridge Road ' (1) ·
'ISLAND ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'Main Street ' (1) ·
'SR-A1A ' (1) ·
'SW 18TH ST ' (1) ·
'US-1 (SR-5) ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
703001 (1) ·
703002 (1) ·
704019 (1) ·
794004 (1) ·
794025 (1) ·
880005 (1) ·
880044 (1) ·
884003 (1) ·
884055 (1) ·
930004 (1) ·
930060 (1) ·
935218 (1) ·
936550 (1) ·
936802 (1) ·
940015 (1)
'0.2MI S OF EDWARDS RD ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'0.5 Mi W of SR-A1A ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'AT 141st ST ' (1) ·
KENNEDY SPACE CENTER (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)