Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Place 004: Titusville & Width 052: 10 & Channel 061: Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly.

Use the filters below to narrow your results.

ObjectID:
Status:
Date:
County 003:
Place 004: (Click arrow to add another value)
Route 005d:
Direction 005e:
Features 006a:
Critical 006b:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Built 027:
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service On 042a:
Service Under 042b:
Kind 043a:
Length 049:
Width 052: (Click arrow to add another value)
Deck 058:
Superstructure 059:
Substructure 060:
Culvert 062:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 2 results in range #1 to #2.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)