Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Deck 058: Very Good & Channel 061: Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly.

Use the filters below to narrow your results.

Status:
Date:
County 003:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
2 (1) · 3 (1) · 5 (1) · 9 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Deck 058: (Click arrow to add another value)
Superstructure 059:
Substructure 060:
Culvert 062:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 5 results in range #1 to #5.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)