Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Channel 061 :
No noticeable or noteworthy deficiencies which affect the condition of the channel. or
Other
& Rebuilt 106:
2005
Use the filters below to narrow your results.
704063 (1) ·
790080 (1) ·
790081 (1) ·
790083 (1) ·
790099 (1) ·
790191 (1) ·
790941 (1) ·
880030 (1) ·
930391 (1) ·
930439 (1) ·
934953 (1) ·
940126 (1)
'.5 mi East of I-95 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'I-95 NB over FECRR ' (1) ·
'I-95 NB over US-1 ' (1) ·
'I-95 SB over FECRR ' (1) ·
'Southern Blvd / E-3 Canal' (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)