Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Lanes 028a:
9
& Channel 061 :
No noticeable or noteworthy deficiencies which affect the condition of the channel. or
Other
Use the filters below to narrow your results.
790221 (1) ·
930015 (1) ·
930251 (1) ·
930401 (1) ·
930413 (1) ·
930428 (1) ·
930460 (1) ·
934213 (1) ·
934273 (1) ·
934327 (1) ·
934902 (1) ·
934924 (1)
'0.25 miles S/O SR 794 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'N of Bellevue Overpass ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-80 & Military Trail ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)