Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Traffic Year 030:
2013
& Channel 061 :
Bridge closed because of channel failure. Corrective action may put back in light service. or
Other
Use the filters below to narrow your results.
'10th Street ' (1) ·
'Bellevue Ave ' (1) ·
'CR-4009 ' (1) ·
'Croton Road ' (1) ·
'Driveway Ent. Exit' (1) ·
'Dubber Road ' (1) ·
'Dunn Avenue ' (1) ·
'Golfview Ave ' (1) ·
'Golfview Avenue ' (1) ·
'I-95 ' (1) ·
'Indian Lake Road ' (1) ·
'Madeline Avenue ' (1) ·
'Pineda Causeway ' (1) ·
'Pinehurst Ave N ' (1) ·
'Shop Ctr Entrance ' (1) ·
'Sixth St. ' (1) ·
'SR-60 ' (1) ·
'Tucker Lane ' (1) ·
'US27 SR-25 & 80 ' (1) ·
Overpass Ramp (1)
700218 (1) ·
700225 (1) ·
700230 (1) ·
700236 (1) ·
704045 (1) ·
704093 (1) ·
704094 (1) ·
704099 (1) ·
704100 (1) ·
704176 (1) ·
705601 (1) ·
790164 (1) ·
790165 (1) ·
790179 (1) ·
790199 (1) ·
790249 (1) ·
790801 (1) ·
794188 (1) ·
794189 (1) ·
794193 (1) ·
795587 (1) ·
880106 (1) ·
930054 (1)
'.2 mi. N of Port St. John' (1) ·
'.9 Mi. N of Port St. John' (1) ·
'0.2 Mile S of Aurora Road' (1) ·
'0.6 Mi E of Williamson Bv' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'0.9mi S of SR-520 ' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.2 miles South of SR-520' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'10thSt 1 Block E of Nova ' (1) ·
'1200ft. N. of SR-400 ' (1) ·
'1400ft. N. of SR-400 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.35MI E OF HENDRY CO LIN' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'2.5 Miles South of SR-520' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'40ft. E. of SR-5A ' (1) ·
'800ft. N. of SR-400 ' (1) ·
'I-95 over SR-46 ' (1) ·
'Sixth St. & Nova Rd Canal' (1) ·
'SR-60 East of 66 Ave ' (1) ·
0.7 Mile N of SR-528 (1)
26433815 (1) ·
27382059 (1) ·
28042875 (1) ·
28075785 (1) ·
28113278 (1) ·
28143333 (1) ·
28194733 (1) ·
28204430 (1) ·
28205754 (1) ·
28250000 (1) ·
28272397 (1) ·
28275799 (1) ·
28395825 (1) ·
29052660 (1) ·
29082970 (1) ·
29095886 (1) ·
29103958 (1) ·
29104333 (1) ·
29104539 (1) ·
29112242 (1) ·
29115274 (1) ·
29134537 (1) ·
29140999 (1)
80274947 (1) ·
80373635 (1) ·
80375599 (1) ·
80391820 (1) ·
80411355 (1) ·
80422723 (1) ·
80463221 (1) ·
80470960 (1) ·
80471577 (1) ·
80494783 (1) ·
80495800 (1) ·
80510902 (1) ·
80521049 (1) ·
81013690 (1) ·
81014276 (1) ·
81014315 (1) ·
81014361 (1) ·
81015422 (1) ·
81024200 (1) ·
81030833 (1) ·
81031853 (1) ·
81054486 (1) ·
81091698 (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)