Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Channel 061 :
Bridge closed because of channel failure. Corrective action may put back in light service. or
Other
& Rebuilt 106:
1990
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'City St. & Crane Creek ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'LAT CANL #45(GLADES INT)' (1) ·
'LATERAL CANAL #38 ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'Palmetto Park Road ' (1) ·
'PHIPP CANAL ' (1) ·
'SR 710 & SCL RR ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'SR 91 TPK RMP 76.3' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 N/S TPK 92.1 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 NB TPK 180.16' (1) ·
'SR91 NB TPK 189.1 ' (1) ·
'SR91 SB TPK 180.16' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
'US-1 ' (1)
700006 (1) ·
700007 (1) ·
700008 (1) ·
880059 (1) ·
880060 (1) ·
880066 (1) ·
880067 (1) ·
880068 (1) ·
890082 (1) ·
890085 (1) ·
930159 (1) ·
930187 (1) ·
930188 (1) ·
930198 (1) ·
930199 (1) ·
930223 (1) ·
930333 (1) ·
940076 (1)
'0.37MI N OF SR-712 ' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.2 MI NO OF LANTANA RD ' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'13 MI S OF SR 60 ' (1) ·
'13 MI SOUTH OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'AT BOCA RATON INTERCHANGE' (1) ·
'Boca Raton ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
119194 (1) ·
136198 (1) ·
177838 (1) ·
18218 (1) ·
28194 (1) ·
34960 (1) ·
62460 (1) ·
77034 (1) ·
80678 (1) ·
80851 (1) ·
90220 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)