Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Owner 022:
State
& Channel 061 :
Bridge closed because of channel failure. Corrective action may put back in light service. or
Other
Use the filters below to narrow your results.
700218 (1) ·
790800 (1) ·
790801 (1) ·
890800 (1) ·
930801 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
930805 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
930811 (1) ·
930812 (1)
'0.2 MI West of US-98 ' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'Lake George Conservation ' (1) ·
0.7 Mile N of SR-528 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)