Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Channel 061 :
Bridge closed because of channel failure. Corrective action may put back in light service. or
No noticeable or noteworthy deficiencies which affect the condition of the channel.
& Future Year 115:
2039
Use the filters below to narrow your results.
884105 (1) ·
890158 (1) ·
891000 (1) ·
930541 (1) ·
930542 (1) ·
930543 (1) ·
930547 (1) ·
931007 (1) ·
931008 (1) ·
934301 (1) ·
945264 (1) ·
945267 (1)
'.25 mi N of SR 706 ' (1) ·
'.3 mi N of SR 706 ' (1) ·
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.3MI E OF DARWIN BLVD ' (1) ·
'03 mi N of SR 706 ' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'StriblingWay ovr E-1canal' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)