Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Lanes 028a:
8
& Channel 061 :
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. or
Other
Use the filters below to narrow your results.
790114 (1) ·
790135 (1) ·
880106 (1) ·
930319 (1) ·
930325 (1) ·
930415 (1) ·
930433 (1) ·
930434 (1) ·
930446 (1) ·
930456 (1) ·
934208 (1) ·
940101 (1)
'.75 MI. S. of US-92 ' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.4 Mi W of I-95 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'Just west of I-95 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'SR-60 East of 66 Ave ' (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)