Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Channel 061 :
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. or
N/A
& Future Year 115:
2036
Use the filters below to narrow your results.
704097 (1) ·
704098 (1) ·
704143 (1) ·
704161 (1) ·
790128 (1) ·
794006 (1) ·
794095 (1) ·
880006 (1) ·
890139 (1) ·
934275 (1) ·
934276 (1) ·
940163 (1)
'0.5MI EAST OF I-95 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2 miles West of US-17 ' (1) ·
'3.7 MILES NORTH OF SR-60 ' (1) ·
'Fay Blvd. - I-95 ' (1) ·
'I-95 (2 mi. N. of SR-76) ' (1) ·
'Minton Road-I-95 ' (1) ·
'S. Williamson BI-I-95 ' (1) ·
'SR-44 over US-1 ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)