Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Traffic Year 030: 2014 & Channel 061 : Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. or Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.

Use the filters below to narrow your results.

Status:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
2 (1) · 3 (1) · 4 (1) · 6 (1)
Traffic Year 030: (Click arrow to add another value)
Service Under 042b:
Length 049:
Width 052:
0 (1) · 10 (1) · 12 (1) · 13 (1) · 14 (1) · 15 (1) · 16 (1) · 18 (1) · 20 (1) · 21 (1) · 25 (1) · 27 (1) · 7 (1) · 9 (1)
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Future Year 115:
Clearance 116:

Showing below up to 27 results in range #1 to #27.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)