Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Channel 061 :
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. or
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.
& Scour 113:
Bridge foundations (including piles) on dry land well above flood water elevations.
Use the filters below to narrow your results.
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)