Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Width 052: 9 & Channel 061 : Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. or Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.

Use the filters below to narrow your results.

Status:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052: (Click arrow to add another value)
Superstructure 059:
Substructure 060:
Culvert 062:
Direction 102:
Rebuilt 106:
Future Year 115:
Clearance 116:

Showing below up to 30 results in range #1 to #30.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)