Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Place 004:
Wellington village
& Channel 061 :
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. or
Other
Use the filters below to narrow your results.
930514 (1) ·
934212 (1) ·
934213 (1) ·
934292 (1) ·
934293 (1) ·
934299 (1) ·
934301 (1) ·
934327 (1) ·
934349 (1) ·
935920 (1)
'1.7 mi. east of SR-7 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'AT SR-80 ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'At US-441 Southern Blvd ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'South Side of US-98 ' (1) ·
'StriblingWay ovr E-1canal' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)