Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Length 049:
49
& Channel 061 :
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. or
N/A
Use the filters below to narrow your results.
704150 (1) ·
704151 (1) ·
790004 (1) ·
930187 (1) ·
930198 (1) ·
930268 (1) ·
930441 (1) ·
930458 (1) ·
930503 (1) ·
930504 (1) ·
940038 (1)
'0.8 MI S OF SR-70 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'US-1 SB over FECRR ' (1)
102500 (1) ·
104500 (1) ·
1800 (1) ·
232000 (1) ·
300 (1) ·
55500 (1) ·
6193 (1) ·
6724 (1) ·
7000 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10250 (1) ·
177838 (1) ·
181308 (1) ·
3123 (1) ·
402520 (1) ·
500 (1) ·
7157 (1) ·
7800 (1) ·
96292 (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)