Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Number 008:
790033
& Channel 061 :
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. or
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition.
Use the filters below to narrow your results.
Showing below up to 1 result in range #1 to #1.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)