Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Substructure 060: Fair & Channel 061 : Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. or Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel.

Use the filters below to narrow your results.

Status:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Superstructure 059:
Substructure 060: (Click arrow to add another value)
Culvert 062:
Direction 102:
Rebuilt 106:
Future Year 115:
Clearance 116:

Showing below up to 12 results in range #1 to #12.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)