Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Channel 061 : Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. or No noticeable or noteworthy deficiencies which affect the condition of the channel. & Inspect Date 090: 08-16

Use the filters below to narrow your results.

Status:
Date:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 6 (1)
Traffic Year 030:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090: (Click arrow to add another value)
Rebuilt 106:
Future Year 115:
Clearance 116:

Showing below up to 13 results in range #1 to #13.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)