Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Facility 007:
'Sea Ray Drive '
& Channel 061 :
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. or
Bridge closed because of channel failure. Corrective action may put back in light service.
Use the filters below to narrow your results.
Showing below up to 1 result in range #1 to #1.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)