Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Channel 061 : Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. or Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. & Future Year 115: 2039

Use the filters below to narrow your results.

ObjectID:
Status:
Route 005d:
Direction 005e:
Features 006a:
Critical 006b:
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Built 027:
Lanes 028a:
1 (1) · 10 (1) · 12 (1) · 2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1) · 7 (1) · 8 (1) · 9 (1)
Traffic 029:
Traffic Year 030:
Length 049:
Width 052:
0 (1) · 10 (1) · 11 (1) · 12 (1) · 13 (1) · 14 (1) · 15 (1) · 16 (1) · 17 (1) · 18 (1) · 19 (1) · 20 (1) · 22 (1) · 23 (1) · 24 (1) · 25 (1) · 26 (1) · 27 (1) · 28 (1) · 29 (1) · 30 (1) · 31 (1) · 32 (1) · 33 (1) · 39 (1) · 40 (1) · 42 (1) · 5 (1) · 55 (1) · 6 (1) · 62 (1) · 7 (1) · 8 (1) · 84 (1) · 9 (1)
Superstructure 059:
Substructure 060:
Future 114:
Future Year 115: (Click arrow to add another value)
Clearance 116:

Showing below up to 212 results in range #1 to #212.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

T


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)