Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Route 005d: 00000 & Channel 061 : Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. or Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel.

Use the filters below to narrow your results.

Status:
Route 005d: (Click arrow to add another value)
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
0 (1) · 10 (1) · 12 (1) · 16 (1) · 7 (1) · 8 (1) · 9 (1)
Superstructure 059:
Substructure 060:
Inspect Date 090:
Rebuilt 106:
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 10 results in range #1 to #10.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)