Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Deck 058: N/A & Channel 061 : Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. or Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly.

Use the filters below to narrow your results.

ObjectID:
Status:
Direction 005e:
Critical 006b:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022:
Lanes 028a:
12 (1) · 2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1) · 7 (1) · 9 (1)
Traffic Year 030:
Service Under 042b:
Type 043b:
Length 049:
10 (1) · 11 (1) · 12 (1) · 13 (1) · 18 (1) · 6 (1) · 7 (1) · 8 (1) · 9 (1)
Width 052:
Deck 058: (Click arrow to add another value)
Superstructure 059:
Substructure 060:
Rebuilt 106:
Deck Type 107:
Future Year 115:
Clearance 116:

Showing below up to 45 results in range #1 to #45.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)