Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'16th St/College Ln' (1) ·
'16th Street ' (1) ·
'53rd Street ' (1) ·
'8th Street N ' (1) ·
'Congress Avenue ' (1) ·
'Dundas Court ' (1) ·
'Hypoluxo Rd ' (1) ·
'Indian Rvrsd Pk Rd' (1) ·
'Island Way ' (1) ·
'North 14th Street ' (1) ·
'North 9th Street ' (1) ·
'Port Malabar BL WB' (1) ·
'Riverbend Park Rd ' (1) ·
'US-27/SR-80 NB ' (1) ·
'US-27/SR-80 SB ' (1)
705920 (1) ·
884081 (1) ·
884083 (1) ·
884084 (1) ·
894063 (1) ·
930528 (1) ·
930537 (1) ·
930538 (1) ·
934176 (1) ·
934177 (1) ·
934367 (1) ·
945013 (1) ·
945014 (1) ·
945015 (1) ·
945016 (1)
'0.1 Miles S. of Ave. D ' (1) ·
'0.14MI N of Indiantown Rd' (1) ·
'0.26 Miles North of CR-68' (1) ·
'0.3 Mi N of Orange Ave. ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'At 74th Avenue ' (1) ·
'At John Stretch Park ' (1) ·
'Between SR704 and 12th St' (1) ·
'Indian Riverside Park ' (1) ·
'Inter 66th Ave/College Ln' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)