Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'Blue Cypress Marsh ' (1) ·
'C-51 Canal ' (1) ·
'C-52 Canal ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'L-78 Borrow Canal ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'Padgett Branch Marsh ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'St. John's Marsh ' (1) ·
'St. Johns Marsh ' (1) ·
'St. Sebastian River ' (1) ·
'WPB CANAL C-51 ' (1)
'6 Ave S to NB I-95' (1) ·
'Becker Rd. ' (1) ·
'Cassadaga Road ' (1) ·
'Crosstown Parkway ' (1) ·
'I 95 SR 9 ' (1) ·
'KIRK ROAD ' (1) ·
'Military Trail ' (1) ·
'Sebastian Blvd EB ' (1) ·
'Sebastian Blvd WB ' (1) ·
'SR 80/Southern Bld' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR70 EB Okeechobee' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1)
704097 (1) ·
704098 (1) ·
790210 (1) ·
880090 (1) ·
880092 (1) ·
880093 (1) ·
880094 (1) ·
880095 (1) ·
880096 (1) ·
880098 (1) ·
880099 (1) ·
884078 (1) ·
884079 (1) ·
930458 (1) ·
930460 (1) ·
930511 (1) ·
930527 (1) ·
934751 (1) ·
940157 (1) ·
941001 (1) ·
944018 (1)
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'12.1Mi. E of SR-91 (TPK) ' (1) ·
'1mi. west of CR-613 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.8 MI East of I-95 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'Cassadaga Road over I-4 ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'SR-80 & Military Trail ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)