Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'Belvedere Road ' (1) ·
'C-52 Canal ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'Rowland Canal ' (1) ·
'SW 10th St. Lowson Blvd ' (1)
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR-60 EB ' (1) ·
'West Farms Road ' (1)
880091 (1) ·
894056 (1) ·
930477 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930486 (1) ·
930487 (1) ·
930493 (1) ·
930494 (1) ·
930497 (1) ·
930498 (1) ·
930499 (1) ·
930500 (1) ·
930501 (1) ·
930502 (1) ·
930525 (1) ·
930526 (1)
'0.3 mile North of SR 80 ' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.5 miles South of SR 806' (1) ·
'2Mi. West of CR-512 ' (1) ·
'E Congress Ave & S SR 806' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1)
10000 (1) ·
101541 (1) ·
104500 (1) ·
114500 (1) ·
13500 (1) ·
16000 (1) ·
240 (1) ·
3400 (1) ·
4800 (1) ·
5300 (1) ·
5800 (1) ·
6174 (1) ·
72500 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
10712 (1) ·
125788 (1) ·
17350 (1) ·
176174 (1) ·
181308 (1) ·
198658 (1) ·
23422 (1) ·
27760 (1) ·
288 (1) ·
5899 (1) ·
8328 (1) ·
9196 (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)