Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal 29 (5 mile creek) ' (1) ·
'Canal C-51 ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'L-5 Canal ' (1) ·
'Lake Gertie ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD E3 Canal ' (1) ·
'SR 811 & FEC RR ' (1) ·
'ST LUCIE CANAL ' (1) ·
'US-17-92-St Johns River ' (1)
'1st St SW ' (1) ·
'2nd AVENUE NORTH ' (1) ·
'5th Street ' (1) ·
'CR-612 8th Street ' (1) ·
'CR-92 EB ' (1) ·
'EB SR 786 ' (1) ·
'Enterprise Rd. ' (1) ·
'I-4 EB ' (1) ·
'Investment Lane ' (1) ·
'Levee Road ' (1) ·
'Linton Blvd. ' (1) ·
'LittleRanchesTrail' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-91 TPK NB 131.0' (1) ·
'WB SR 786 ' (1) ·
'Woolbright Road ' (1)
790191 (1) ·
790197 (1) ·
794186 (1) ·
884069 (1) ·
884072 (1) ·
884073 (1) ·
891000 (1) ·
930491 (1) ·
930492 (1) ·
930802 (1) ·
930803 (1) ·
934162 (1) ·
934364 (1) ·
934986 (1) ·
934989 (1) ·
935920 (1) ·
940152 (1)
'0.4 Mile West of US 17-92' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.5 MI. W of Military Tr ' (1) ·
'0.5 Mile West of I-95 ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1st overpass east of I-95' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'At 58th Ave ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'South Side of US-98 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)