Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-3 Canal ' (1) ·
'C-51 Canal ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'El Rio Canal ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'L-5 Canal ' (1) ·
'Lake Ida Canal E-4 ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD L30 Canal ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'US-17-92 -St Johns River' (1) ·
'WB SR 80 ' (1)
'12th Street ' (1) ·
'4th Street ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'Gateway Blvd. ' (1) ·
'Hagen Ranch Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 WB ' (1) ·
'Lake Ida Road ' (1) ·
'Levee Road ' (1) ·
'Lyons Rd ' (1) ·
'NB SR 807 ' (1) ·
'NBSR807 to EBSR80 ' (1) ·
'SB SR 807 ' (1) ·
'SBSR807 to EBSR80 ' (1) ·
'Spanish River Blvd' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'Stribling Way ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1) ·
'WB Forest Hill Bld' (1)
790196 (1) ·
884071 (1) ·
884074 (1) ·
884075 (1) ·
930450 (1) ·
930472 (1) ·
930473 (1) ·
930474 (1) ·
930475 (1) ·
930476 (1) ·
930490 (1) ·
930512 (1) ·
930513 (1) ·
930514 (1) ·
930532 (1) ·
930533 (1) ·
930804 (1) ·
931004 (1) ·
934301 (1) ·
934363 (1) ·
934954 (1) ·
934958 (1) ·
934963 (1) ·
935222 (1)
'0.5MI W of SR-809 Mil Trl' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'2.7 miles N of SR 806 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'At CR-613 ' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'StriblingWay ovr E-1canal' (1)
26195649 (1) ·
26222805 (1) ·
26231070 (1) ·
26234852 (1) ·
26234905 (1) ·
26282306 (1) ·
26290179 (1) ·
26295890 (1) ·
26325823 (1) ·
26333297 (1) ·
26380939 (1) ·
26390300 (1) ·
26403435 (1) ·
26403445 (1) ·
26403485 (1) ·
26403501 (1) ·
26403530 (1) ·
26403721 (1) ·
26403812 (1) ·
26404472 (1) ·
27351498 (1) ·
27363390 (1) ·
27372705 (1) ·
28500808 (1)
80044365 (1) ·
80045427 (1) ·
80045433 (1) ·
80045890 (1) ·
80045945 (1) ·
80045990 (1) ·
80051470 (1) ·
80054717 (1) ·
8005960 (1) ·
80062196 (1) ·
80075116 (1) ·
80094882 (1) ·
80095982 (1) ·
80101517 (1) ·
80102700 (1) ·
80112020 (1) ·
80121322 (1) ·
80264806 (1) ·
80264867 (1) ·
80264934 (1) ·
80350835 (1) ·
80350917 (1) ·
80462658 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)