Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR-512 ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'DONALD ROSS RD WB ' (1) ·
'EB SR706 ' (1) ·
'Indian Lake Road ' (1) ·
'Levee Road ' (1) ·
'Port St. John Pkwy' (1) ·
'SR-714 ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'US-1 ' (1) ·
'US-98 SR700 US441 ' (1) ·
'WB SR 706 ' (1) ·
SR-46 (1)
700194 (1) ·
700199 (1) ·
700203 (1) ·
790801 (1) ·
884065 (1) ·
884067 (1) ·
884068 (1) ·
890159 (1) ·
930453 (1) ·
930454 (1) ·
930465 (1) ·
930811 (1) ·
931002 (1) ·
931003 (1) ·
934160 (1)
'0.3MI S OF SR-60 ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'Port St. John Pkwy - I-95' (1) ·
'SR-700 CANAL POINT ' (1) ·
'Turnpike at Stuart exit. ' (1) ·
'US-1 over Turkey Creek ' (1) ·
SR-46 over Six Mile Cr (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)