Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alta Drive ' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'EB SR706 ' (1) ·
'Indian Lake Road ' (1) ·
'JOG ROAD SB ' (1) ·
'Levee Road ' (1) ·
'LYONS ROAD ' (1) ·
'OKEELANTA RD. ' (1) ·
'PARK AVE. W. ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'US-98 SR700 US441 ' (1) ·
'WB SR 706 ' (1)
790801 (1) ·
795503 (1) ·
930453 (1) ·
930454 (1) ·
930465 (1) ·
930811 (1) ·
931002 (1) ·
931003 (1) ·
934160 (1) ·
934164 (1) ·
934294 (1) ·
934296 (1) ·
934522 (1) ·
934938 (1) ·
934953 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'At LPGA Blvd. ' (1) ·
'AT US-27 ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'SR-700 CANAL POINT ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)