Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'L-5 Canal ' (1) ·
'Lateral Canal A ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sweetwater Creek ' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'CAMINO REAL ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'ISLAND WAY ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'MONET ROAD ' (1) ·
'NB US-27 SR-25 ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR-421 ' (1) ·
'SR-520 ' (1) ·
'SR-60 ' (1) ·
'TROPICALIA AVE. ' (1)
700193 (1) ·
790171 (1) ·
790173 (1) ·
880087 (1) ·
880106 (1) ·
884056 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
930353 (1) ·
934126 (1) ·
934240 (1) ·
934950 (1) ·
934960 (1) ·
936551 (1) ·
940142 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.75 mi. E. of I-95 ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'250ft North of SR-60 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Palm Beach - Broward Line' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-60 East of 66 Ave ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)