Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBARA BASIN ' (1) ·
'Berrys Canal ' (1) ·
'Canal ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'E-2-E Canal ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I-4 ' (1) ·
'L-5 Canal ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'Misner Creek ' (1) ·
'NORTH CANAL ' (1) ·
'Nova Canal ' (1) ·
'ROY'S SWALE ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
Banana River Relief (1)
'10th Street ' (1) ·
'8th Street ' (1) ·
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'EB SR60 ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD NB ' (1) ·
'Lake Worth Road ' (1) ·
'Saxon Blvd EB ' (1) ·
'SB US-27 SR-25 ' (1) ·
'SILVER FOX LANE ' (1) ·
'SIMARA STREET ' (1) ·
'SR-40 ' (1) ·
'SR-44 ' (1) ·
'SR-5A ' (1) ·
'SR-60 WB ' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
SR-520 (1)
700192 (1) ·
790149 (1) ·
790167 (1) ·
790168 (1) ·
790169 (1) ·
790179 (1) ·
790180 (1) ·
790182 (1) ·
884057 (1) ·
884058 (1) ·
884059 (1) ·
884060 (1) ·
894042 (1) ·
895505 (1) ·
930352 (1) ·
930456 (1) ·
931001 (1) ·
934155 (1) ·
934156 (1) ·
934297 (1) ·
934939 (1)
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.9Mi S OF WOOLBRIGHT ' (1) ·
'10thSt 1 Block E of Nova ' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'2.2 Miles North of US-92 ' (1) ·
'8th St West of SR-5A ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Palm Beach - Broward Line' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'SR-40 west of SR-5A ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-5A at 3rd St ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1) ·
SR-520 - Banana River (1)
26200870 (1) ·
26290212 (1) ·
26370275 (1) ·
26370347 (1) ·
26420393 (1) ·
26455824 (1) ·
26455826 (1) ·
27023873 (1) ·
27111437 (1) ·
27385855 (1) ·
27385856 (1) ·
27392294 (1) ·
27392357 (1) ·
28212829 (1) ·
28543983 (1) ·
29014148 (1) ·
29132818 (1) ·
29135704 (1) ·
29140326 (1) ·
29140999 (1) ·
29164002 (1)
80051706 (1) ·
80051771 (1) ·
80084942 (1) ·
80085094 (1) ·
80102258 (1) ·
80102528 (1) ·
80111729 (1) ·
80225809 (1) ·
80225872 (1) ·
80230306 (1) ·
80230357 (1) ·
80310465 (1) ·
80321939 (1) ·
80365438 (1) ·
80551845 (1) ·
81025860 (1) ·
81031490 (1) ·
81031750 (1) ·
81031853 (1) ·
81051670 (1) ·
81161879 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)