Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E Gateway Blvd ' (1) ·
'HOOD RD 110.944 ' (1) ·
'INDIAN STREET ' (1) ·
'NB I 95 to Gateway' (1) ·
'SIMARA STREET ' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'Tangerine Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1)
894040 (1) ·
895504 (1) ·
930428 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930433 (1) ·
930434 (1) ·
930435 (1) ·
930441 (1) ·
930800 (1) ·
934506 (1)
'0.7MI E of DIXIE HWY A1A ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'700 ft S of Gateway Blvd ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)