Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-37 Canal ' (1) ·
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'FL. TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'M CANAL ' (1) ·
'N CANAL ' (1) ·
'None ' (1) ·
'Over D Canal ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 91 TPK ' (1) ·
'TIDAL CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'20TH AVENUE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'E Gateway Blvd ' (1) ·
'HAVERHILL ROAD ' (1) ·
'HOOD RD 110.944 ' (1) ·
'INDIAN STREET ' (1) ·
'Minton Rd. ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'NB I 95 to Gateway' (1) ·
'Palm Bay Library ' (1) ·
'SIMARA STREET ' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'SUMMIT BLVD ' (1) ·
'Tangerine Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'YAMATO RD ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
704143 (1) ·
704256 (1) ·
884062 (1) ·
894040 (1) ·
895504 (1) ·
930428 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930433 (1) ·
930434 (1) ·
930435 (1) ·
930438 (1) ·
930441 (1) ·
930800 (1) ·
934228 (1) ·
934256 (1) ·
934506 (1) ·
934922 (1) ·
934923 (1) ·
934928 (1) ·
934945 (1) ·
934946 (1)
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'10ft. E of Minton Road ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'Minton Road-I-95 ' (1)
26212592 (1) ·
26212629 (1) ·
26233914 (1) ·
26233917 (1) ·
26233970 (1) ·
26312802 (1) ·
26313526 (1) ·
26313548 (1) ·
26314057 (1) ·
26314099 (1) ·
26315179 (1) ·
26325800 (1) ·
26330210 (1) ·
26330220 (1) ·
26394749 (1) ·
26410304 (1) ·
26442375 (1) ·
26450216 (1) ·
26515528 (1) ·
27102110 (1) ·
27111660 (1) ·
27355685 (1) ·
27594683 (1) ·
28025656 (1)
80041200 (1) ·
80041240 (1) ·
80041485 (1) ·
80070375 (1) ·
80074101 (1) ·
80074430 (1) ·
80075210 (1) ·
80101583 (1) ·
80101586 (1) ·
80101974 (1) ·
80101977 (1) ·
80102132 (1) ·
80102271 (1) ·
80102293 (1) ·
80112090 (1) ·
80120025 (1) ·
80121064 (1) ·
80121067 (1) ·
80123610 (1) ·
80162939 (1) ·
80242120 (1) ·
80321756 (1) ·
80401656 (1) ·
80401795 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)