Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bulow Creek ' (1) ·
'C-104 CANAL ' (1) ·
'C-37 Canal ' (1) ·
'CANAL C-104 ' (1) ·
'Canal C-46 ' (1) ·
'CANAL E-1 ' (1) ·
'CANAL E-4 ' (1) ·
'I-95 ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'Little Cow Creek ' (1) ·
'LWDD E-4 Canal ' (1) ·
'M-1 CANAL ' (1) ·
'RIO MAR BAY ' (1) ·
'Rose Bay Canal ' (1) ·
'Samsula Canal ' (1) ·
'SR-91 (FL TURNPIKE) ' (1)
'Americana Blvd. ' (1) ·
'ARMONE PLACE ' (1) ·
'Cow Creek Road ' (1) ·
'CR-516 ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'DUNN ROAD ' (1) ·
'Eldron Blvd. ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'Hunting Camp Road ' (1) ·
'Main Street ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'PEACHTREE BLVD. ' (1) ·
'Quantum Blvd. ' (1) ·
'Samsula Drive ' (1) ·
'SELVITZ ROAD ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'VETERANS WALK ' (1) ·
'Walter Boardman Ln' (1)
700188 (1) ·
705917 (1) ·
705918 (1) ·
794122 (1) ·
794126 (1) ·
794130 (1) ·
794184 (1) ·
794185 (1) ·
885808 (1) ·
934482 (1) ·
934489 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1) ·
937367 (1) ·
945269 (1) ·
945270 (1) ·
945271 (1) ·
949901 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.2MI. W of NW STJAMES DR' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.5MI S of CR 712 ' (1) ·
'0.5MI S of CR-712 ' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'AT SR-7 US-441 ' (1) ·
'CR-516 over I-95 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)